Factories, cold stores, hotels, offices, retail

Commercial and industrial: produce the electricity your business uses.

For factories, cold stores, hotels, clinics and offices, we design rooftop, carport or ground-mounted plants sized to your consumption profile, then we maintain them.

Your challenges

What we hear in the field.

A heavy cost line

Refrigeration, compressed air and motors run non-stop, and electricity becomes one of your largest costs.

Daytime consumption

Your activity consumes when the sun produces: the ideal profile for self-consumption.

Operations that never stop

Cold store, hotel or clinic: installation is scheduled around your operations, and maintenance keeps the plant productive.

Logistics warehouse roof fitted with solar panels
Scope

A plant designed for your processes, not a catalogue.

We start from your bills, load curves and operating hours to define the right capacity and configuration.

  • Rooftop, carport or ground-mounted plants
  • Load profile and operating-hours analysis
  • Integration with the main LV board and existing protections
  • Shading study and roof check
  • Remote supervision and preventive maintenance
  • Grid connection file
Our projects

See our installations in the field.

Photos of our sites and plants in operation, gathered on one page.

Deliverables

What you receive, in writing.

01

Site survey

Measurements, photos, access and constraints.

02

Production simulation

Estimated monthly and annual output, written assumptions.

03

Single-line diagram

From the PV array to the connection point.

04

Layout plan

Module positions and cable routing.

05

Detailed proposal

Bill of materials, scope, schedule.

06

Commissioning file

Tests, checklist and handover report.

07

As-built file

As-built drawings, datasheets, serial numbers, warranties and user guide.

08

Load-curve analysis

Production versus consumption across the day.

Project path

Six stages, each signed off with you.

The same discipline for a villa, a factory or an EV charger. Only the size and depth of the studies change.

  1. 01

    Site visit

    On-site survey, bills, electrical board, roof or land.

    You sign off : The site survey

  2. 02

    Study and proposal

    Sizing, production simulation, single-line diagram, layout plan, bill of materials.

    You sign off : The proposal and schedule

  3. 03

    Procurement

    Equipment from manufacturers we are certified with, references and serial numbers tracked.

    You sign off : The list of delivered equipment

  4. 04

    Installation

    Supervised crew, safe work at height, isolation before any electrical work, site left clean.

    You sign off : The progress milestones

  5. 05

    Testing and commissioning

    Electrical checks before energising, inverter and monitoring setup.

    You sign off : The handover report

  6. 06

    Handover and follow-up

    As-built file, user walkthrough, maintenance contract proposal.

    You sign off : The maintenance level

Before handover

The checks we run before energising.

These checks follow the commissioning tests described in IEC 62446-1. Results are recorded in your file.

  • Continuity of protective conductors and earthing
  • Polarity of every module string
  • Open-circuit voltage and current of every string
  • Insulation resistance of the DC wiring
  • Operation of protection devices and isolators
  • Inverter setup and connection to monitoring
Operations

After commissioning, we stay.

Remote monitoring, preventive maintenance with cleaning and corrective work: choose the level that suits your site.

Technician fitting a solar panel on a roof
Technical visit

What we survey on your site.

The visit usually takes one to two hours. It gives us everything needed for serious sizing, with no guesswork.

  • 12 months of bills

    To see seasonality and the real cost per kWh.

  • Subscribed power and voltage

    Low or medium voltage, transformer, meter.

  • Major loads

    Compressors, cold rooms, pumps, air conditioning: nameplates and schedules.

  • Roof or land

    Type, condition, area, orientation, shading, access.

  • Main switchboard

    Existing protection, earthing, cable route.

  • Activity profile

    Working hours, peak and low seasons, outages and generator use.

Phased start

Start with a first phase, then extend.

For sites that want to see results first, we design the complete installation but build it in two stages: a first phase sized on your daytime consumption, then the extension once the first months of production have been measured.

  • Full design from day one: structure, cables and switchboard ready for the extension
  • First phase covering the daytime base load
  • Production monitored and compared with your bills
  • Extension decided on real measurements, not on a promise
FAQ

Commercial & industrial

Do we need to stop production during works?

No, in most cases. Installation is scheduled with you and the final connection happens in a short, pre-agreed window.

Can my roof carry panels?

We check the roof's condition and structure during the study. If it is not suitable, we look at carports or a ground-mounted plant.

Can I cover my cold rooms at night?

Solar produces during the day. Battery storage can cover part of evening needs; we assess whether it makes sense for your site.

Every project starts with a site visit.

After your request

  1. 1
    We call you to understand your site and consumption.
  2. 2
    Technical visit on-site surveys, no commitment.
  3. 3
    Written file solution, equipment, assumptions and proposal.

We come to your site, anywhere in Morocco, and leave with what a serious technical file needs.

Call us: +212 620 242 085 · +212 604 800 034