Villas and homes

Your home, your electricity.

For villas and homes, we design self-consumption systems, with or without batteries, with production monitoring on your phone.

Your challenges

What we hear in the field.

A rising bill

Air conditioning, pool, water heater: a villa's consumption climbs fast.

Annoying outages

A hybrid system with batteries keeps essentials running during an outage.

Fear of a poor installation

Careful installation and real follow-up prevent bad surprises.

Solar panels on a tiled roof
Scope

A clean installation, sized for your household.

We study your consumption and roof to propose the best configuration, with equipment from recognised brands.

  • Grid-tied self-consumption
  • Hybrid systems with batteries
  • Monitoring app on your phone
  • Careful, discreet installation
  • Commissioning and full walkthrough
  • Maintenance and support
Our projects

See our installations in the field.

Photos of our sites and plants in operation, gathered on one page.

Deliverables

What you receive, in writing.

01

Site survey

Measurements, photos, access and constraints.

02

Production simulation

Estimated monthly and annual output, written assumptions.

03

Single-line diagram

From the PV array to the connection point.

04

Layout plan

Module positions and cable routing.

05

Detailed proposal

Bill of materials, scope, schedule.

06

Commissioning file

Tests, checklist and handover report.

07

As-built file

As-built drawings, datasheets, serial numbers, warranties and user guide.

08

Storage option

Battery sizing if you want it.

Project path

Six stages, each signed off with you.

The same discipline for a villa, a factory or an EV charger. Only the size and depth of the studies change.

  1. 01

    Site visit

    On-site survey, bills, electrical board, roof or land.

    You sign off : The site survey

  2. 02

    Study and proposal

    Sizing, production simulation, single-line diagram, layout plan, bill of materials.

    You sign off : The proposal and schedule

  3. 03

    Procurement

    Equipment from manufacturers we are certified with, references and serial numbers tracked.

    You sign off : The list of delivered equipment

  4. 04

    Installation

    Supervised crew, safe work at height, isolation before any electrical work, site left clean.

    You sign off : The progress milestones

  5. 05

    Testing and commissioning

    Electrical checks before energising, inverter and monitoring setup.

    You sign off : The handover report

  6. 06

    Handover and follow-up

    As-built file, user walkthrough, maintenance contract proposal.

    You sign off : The maintenance level

Before handover

The checks we run before energising.

These checks follow the commissioning tests described in IEC 62446-1. Results are recorded in your file.

  • Continuity of protective conductors and earthing
  • Polarity of every module string
  • Open-circuit voltage and current of every string
  • Insulation resistance of the DC wiring
  • Operation of protection devices and isolators
  • Inverter setup and connection to monitoring
Operations

After commissioning, we stay.

Remote monitoring, preventive maintenance with cleaning and corrective work: choose the level that suits your site.

Cleaning solar modules
Technical visit

What we survey on your site.

The visit usually takes one to two hours. It gives us everything needed for serious sizing, with no guesswork.

  • 12 months of bills

    To see seasonality and the real cost per kWh.

  • Subscribed power and voltage

    Low or medium voltage, transformer, meter.

  • Major loads

    Compressors, cold rooms, pumps, air conditioning: nameplates and schedules.

  • Roof or land

    Type, condition, area, orientation, shading, access.

  • Main switchboard

    Existing protection, earthing, cable route.

  • Activity profile

    Working hours, peak and low seasons, outages and generator use.

FAQ

Residential

Do I need batteries?

Not always. They help if you consume a lot in the evening or want power during outages. We advise based on your use.

Can I track my production?

Yes, in real time from an app on your phone.

Will it damage my roof?

No. We choose fixings suited to your roof and check waterproofing.

Every project starts with a site visit.

After your request

  1. 1
    We call you to understand your site and consumption.
  2. 2
    Technical visit on-site surveys, no commitment.
  3. 3
    Written file solution, equipment, assumptions and proposal.

We come to your site, anywhere in Morocco, and leave with what a serious technical file needs.

Call us: +212 620 242 085 · +212 604 800 034

Email us: contact@heliocoretech.com

WhatsApp